ОписаниеAEC-69-8491 Four 1.3-million-gallon tanks are being constructed at the Savannah River Plant for the storage of radioactive wastes. Two of the four, shown in this photo (1968), are nearing the completion of their double steel shells. Shortly after this stage of fabrication the inner tanks are stress relieved – the largest carbon steel vessels of this design to be so treated. To do this, hot exhaust gases from heaters located on tank top are directed into its interior. The interior wall temperature is gradually raised, and then held at 1,100 oF. For 1 hour. At that temperature, tank’s 85-foot diameter has increased by 9 inches; to prevent sagging, the tank top is independently supported by temporary trusses, visible at the upper left. The heat treatment removes welding stresses that make the steel susceptible to cracking when exposed to the concentrated sodium nitrate – sodium hydroxide of the waste solution. Credit: Savannah River Plant