الوصفIn the course of the third session of the International Atomic Energy Agency's (IAEA.) General Conference, construction work on the Agency's functional laboratory at Seibersdorf near Vienna was inaugurated by the Director General, Mr. Sterling Cole, on 28 September 1959. The laboratory, a one—storey, U—shaped building in reinforced concrete is being set up on a 14-acre site leased to the Agency by the Oesterreichische Studiengesellschaft fuer Atomenergie (Austrian Research Society for Atomic Energy)and will cover 2,095 sq. feet. Building costs are estimated at 420,000 and the cost of equipment at 180,000, the total having been donated by the US Government. During the brief inauguration ceremony a medal, some 2" in diameter, bearing the Agency's emblem and the inscription “First Laboratory IAEA” on one side, and the date “28 September 1959” on the other, has been inserted into the first load of concrete poured into the foundations for the building. IAEA/28 September 1959/No.490. Please credit IAEA